Systems Integration SolutionsEngineering through startup.
Honest Controls, LLC — Systems Integration Solutions

Project experience / Selected examples

Automation
put to work.

Selected Honest Controls work and the earlier engineering experience we bring to new projects, from carton handling to legacy controls and system-level coordination.

01 / Completed Honest Controls project · 2025

Empty-carton line
modernization.

Electrical installation and controls software brought together around the flow of cartons.

MDR CONVEYORSPLC + HMIBARCODE TRACKINGFIELD INSTALLATION

The work

We brought together electrical rewiring and PLC control of individual motor-driven roller zones, carton-erector controls, and barcode-based carton tracking.

At the operator interface

HMI-adjustable carton reserve gave operators control of carton supply. Tracking logic reconciled cartons manually inserted into or removed from the line.

In the field

The installation was completed and placed into operation, with site monitoring and redlined CAD/as-built updates supporting the handover.

The result: A running, integrated carton-handling line connecting field wiring, conveyor control, tracking, and operator settings.

02 / Earlier engineering experience

Phased legacy-PLC
migration.

Modernize a conveyor and sortation system while managing the transition between old and new controls.

PLC-5 → CONTROLLOGIXPHASED TRANSITIONCONVEYOR + SORTATION

The work

Our engineering background includes a phased migration involving approximately 20 processors, moving a conveyor and sortation system from PLC-5 to ControlLogix.

A separate three-rack migration included HMI work, operator training, and maintenance documentation, with startup carried out during a planned weekend changeover.

What carries into a new project: migration sequencing, interface awareness, cutover preparation, and a focus on the information the operations and maintenance teams need afterward.

These migration examples reflect engineering work completed before Honest Controls, LLC.

03 / Earlier engineering experience

Sorter flow &
gridlock logic.

Controls changes for a distribution-center sortation application included automatic speed calculation, induct metering, and anti-gridlock behavior.

  • System-level flow behavior
  • Induction and merge coordination
  • Equipment-state-aware controls

04 / Earlier engineering experience

Routing through
palletizing.

Packaging-flow changes addressed SKU routing, downstream interlocks, merge release, and coordination with palletizer availability.

  • Routing and destination logic
  • Upstream/downstream interlocks
  • Machine-to-machine coordination

Putting experience to work

From individual machines
to the wider operation.

We apply this engineering experience to new automation projects, combining controls design, panels, software, electrical installation, and startup. The aim is a connected system with practical operator tools and the documentation to maintain it.

Let’s talk automation.

Bring the challenge.
Let’s build the solution.

Tell us what needs to change, what equipment is involved, and where you want to take the operation.

Discuss a turnkey project michael@honestcontrols.com